Lateral Sway Bracing
A device to prevent pipe breakage caused by excessive shaking in case of earthquake
The maximum spacing between the braces is less than 12m, and it is installed in the fire main pipe and the cross piping.
In the case of other piping, it is installed when the diameter is 65mm or more.
The distance between the ends does not exceed 1.8m.
- Installable angle: 30˚ ~ 90˚
- Installation piping specifications: 50A ~ 200A
- Low ceiling and CPVC a combined use Inventory management is easy
- Minimum installation height 173 mm
- Convenient visual identification via bolt head


Support length(KS) | Support length | 30˚ ~ 44˚(Nm) | 45˚ ~ 59˚(Nm) | 60˚ ~ 74˚(Nm) | 75˚ ~ 90˚(Nm) |
---|---|---|---|---|---|
50A | 3,200 | 2,224 | 3,145 | 3,852 | 4,448 |
65A | 3,200 | 2,224 | 3,145 | 3,852 | 4,448 |
80A | 3,200 | 2,224 | 3,145 | 3,852 | 4,448 |
100A | 3,200 | 2,224 | 3,145 | 3,852 | 4,448 |
125A | 3,200 | 3,559 | 5,033 | 6,164 | 7,117 |
150A | 3,200 | 3,559 | 5,033 | 6,164 | 7,117 |
200A | 3,200 | 4,482 | 6,338 | 7,763 | 8,963 |