TUTUM easy-seismic 3 Benefit
Fast, Accurate and Minimum-Quantity Design
TUTUM 3
- Apply patent registration algorithms to minimize time and quantities
- Once the drawing analysis is completed, all subsequent processes will be processed automatically.
- TUTUM handle all process automatically
from sway brace placement to seismic calculation sheet creation.
- Target Project
- - Design Target : 2,302㎡ Space, 1 BP, 3 GF
- Designer A, B, C : Less than 1 year of experience
- Designer D : Over 10 years of experience
- Time Required
- - Designer D’s Manual Design Time : 153 Minutes
- Designer A, B, C’s Average Auto Design Time : 86 Minutes
- Quantity of Placed Sway Brace
- - Designer D’s Manual Design Quantity : 55 ea
- Designer A, B, C’s Average Auto Design Quantity : 42 ea
- Manual design of D in underground pump room (PT)
is more than twice quantity that of A, B, C’s auto design.
Reduce Design Time and Avoid Over-Design
Fig.8 Auto Design of C
Fig.10 Manual Design of D
| Designer | A | B | C | D | |
|---|---|---|---|---|---|
| Designe Method | by TUTUM | by TUTUM | by TUTUM | Manually | |
| Time Required | 98 min | 65 min | 95 min | 153 min | |
| Riser | 4way | 8 | 5 | 5 | 6 |
| PT | Lateral | 5 | 6 | 4 | 11 |
| Longitudinal | 5 | 6 | 4 | 11 | |
| B1 | Lateral | 3 | 3 | 3 | 4 |
| Longitudinal | 2 | 2 | 2 | 2 | |
| 1F | Lateral | 3 | 3 | 3 | 3 |
| Longitudinal | 2 | 2 | 2 | 2 | |
| 2F | Lateral | 3 | 3 | 3 | 3 |
| Longitudinal | 2 | 2 | 2 | 2 | |
| 3F | Lateral | 3 | 3 | 3 | 3 |
| Longitudinal | 2 | 2 | 2 | 2 | |
| Total | Lateral | 17 | 18 | 16 | 24 |
| Longitudinal | 13 | 14 | 12 | 19 | |
| 4way | 8 | 5 | 5 | 6 | |
| Total | 46 | 42 | 38 | 55 | |
Table 3. Comparison of Results by Design Method : Design by TUTUM vs. Manually (Figure 4 - Figure 10)
Extract from a paper of [Fire Sci. Eng., Vol3, No.5, pp.140-148, 2019 eISSN: 2508-6804 l pISSN: 1738-7167]